Unit 3 Mountpark Ferrybridge, Knottingley, WF11
Description
Reserved Matters planning consent has been obtained for a single cross-dock logistics facility of 640,000 sq ft which will be speculatively constructed. Vertical build will commence in September 2026 with completion of the unit in Q4 2027.
Specification:
> 21m clear haunch height
> 80 dock loading doors including 50% euro-docks
> 6 level access doors
> 50KN/m2 floor loading
> 445 car parking spaces, including 44 EV spaces
> 4.5 MVA available
> 2 x 50m depth secure yards
> Passive roof ventilation
> Ribbon glazing to marshalling areas
> PV roof array
> Roof terrace
> Diverse fibre connection ready
> BREEAM 'Outstanding' target
> EPC A+ target
Location
Key property details
- Property type(s)
- General Industrial and Storage & Distribution
- Tenure details
- To be advised
- Property agent(s)
- Rich Harris Marissa Allott
- Carter Jonas reference
- 20020147
Description
Reserved Matters planning consent has been obtained for a single cross-dock logistics facility of 640,000 sq ft which will be speculatively constructed. Vertical build will commence in September 2026 with completion of the unit in Q4 2027.
Specification:
> 21m clear haunch height
> 80 dock loading doors including 50% euro-docks
> 6 level access doors
> 50KN/m2 floor loading
> 445 car parking spaces, including 44 EV spaces
> 4.5 MVA available
> 2 x 50m depth secure yards
> Passive roof ventilation
> Ribbon glazing to marshalling areas
> PV roof array
> Roof terrace
> Diverse fibre connection ready
> BREEAM 'Outstanding' target
> EPC A+ target
Location
Key property details
- Property type(s)
- General Industrial and Storage & Distribution
- Tenure details
- To be advised
- Property agent(s)
- Rich Harris Marissa Allott
- Carter Jonas reference
- 20020147