Wax Lyrical Wind Turbine Development Cumbria
rapeseed field with wind turbines against a blue sky
Client
Chandlers Country Properties Limited
Sector
Energy & Marine
Location
Cumbria
How we helped
Rural land and business Energy Capital markets
Statistics
£1.3m
wind turbine development
@
Get in touch
PREV:
NEXT:

Chandlers Country Properties were granted planning permission for a wind turbine development on their land next to Lindal Business Park in December 2013. The wind turbine has been developed to power the business park and resident candle factory, which is a heavy user of electricity, utilising over 1300MW of electricity per annum. The wind turbine is capable of generating between 1300MW and 2400MW of electricity per year depending on the wind speed. The wind turbine can therefore directly offset power usage at the business park, with energy cost savings estimated at 25-30%, helping to ensure the long term security of the business park and its employees. The wind turbine received significant local support on these grounds.


Carter Jonas were initially appointed to assist with securing Ofgem preliminary accreditation for the wind turbine development, which needed to be submitted prior to the 31 December 2013 to secure the Feed-In Tariff. Subsequently we were retained to advise, assist and manage the £1.3 million wind turbine development through to successful operation. This included assistance with the appointment and management of contractors; advice on turbine supply agreement and operation & maintenance terms, including contract negotiation and review; advice and arrangement of project insurance cover; negotiation and arrangement of power purchase and metering agreements; Ofgem accreditation; and general project management support and assistance throughout the project.

The wind turbine development presented several challenges. The existing grid connection at the business park had to be replaced to enable the new supply, and the electrical works to enable the connection were extensive, with over 3km of new cabling and earthing installed. To allow delivery of the turbine to the site parking restrictions were required, traffic lights had to be temporarily removed and vehicles were routed on contraflow with police escorts. Despite these complexities, the development was successfully built and began operating within 10 months of receiving approval.

Related Case Studies
Kings Lynn DCO
Infrastructures

Kings Lynn DCO

Whilst working for NGET, a team member was charged with leading the consents and land rights for a n...

View case study
National Grid (NGET)
Infrastructures

National Grid (NGET)

A member of Carter Jonas was Lead Consents Officer for the North West Coast Connections, a project t...

View case study
Burringham Wind Turbine Development
Infrastructures

Burringham Wind Turbine Development

Ian Fowler & Co, a farming company in North Lincolnshire, appointed Carter Jonas to determine the po...

View case study
Poskitts Anaerobic Digestion Plant
Infrastructures

Poskitts Anaerobic Digestion Plant

MH Poskitt, a specialist grower of root vegetables for leading supermarkets, appointed Carter Jonas ...

View case study
Restoration of the Dinmor Coastal Quarry
Infrastructures

Restoration of the Dinmor Coastal Quarry

The Minerals & Waste Management Division advised on the restoration of the Dinmor coastal quarry on ...

View case study
Element Power (Ireland) Limited, Project Greenlink
Infrastructures

Element Power (Ireland) Limited, Project Greenlink

Carter Jonas is providing land and property advice for this interconnector project between the UK an...

View case study
Ullswater Heights
Infrastructures

Ullswater Heights

New energy development to reduce energy costs while improving the reliability and sustainability of ...

View case study